Avoiding Madness.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Author(s): Gswlik, Kate
  • Source:
    ENR: Engineering News-Record. 4/26/2021, Vol. 286 Issue 9, p27-33. 6p. 7 Color Photographs.
  • Additional Information
    • Subject Terms:
    • Abstract:
      The article discusses the process that takes a project from a plan on a computer to shovels in the ground is a lengthy one. Topics discussed include Construction and design teams have embraced different project-delivery methods to offset some of the typical construction hurdles that can make the process even longer; and public private partnership (P3), design-build (DB) or alternative project delivery (APD) method really make a difference.