The new Cooper River bridge [DVD] : the Arthur Ravenel Jr. bridge: a bridge to the future 2005/ a production of SCETV.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Abstract:
      Summary: "This is an up close look at the 4 years that were spent in building the largest cable stayed bridge in North America. With unprecedented access provided by the State Dept. of Transportation and the construction company "Palmetto Bridge Constructors" ETV was able to go behind the scenes and cover every aspect of teh design/build process. In depth interviews with officials and works alike, ariel footage at various stages, detailed footage of the building process and a glimpse of the week of celebration leading up to the Grand opening in July of 2005 make this a unique video documentary of the bridge to the future." -- SCETV website.
    • Notes:
      1 3 4
    • Other Titles:
      The Arthur Ravenel Jr. Bridge: bridge to the future (The new Cooper River bridge) Arthur Ravenel bridge.
    • Accession Number:
      ccp.389308